Second Update on Funding Gaps for Rapid and Conventional Transit in the Greater Toronto and Hamilton Area

By Transport Action Ontario | Latest News

Dec 18

Transport Action Ontario has released a second update report and backgrounder on funding gaps for transit in the GTHA.  It reflects an assumed rapid transit network as proposed by Metrolinx in their 2017 draft Regional Transportation Plan, rather than that identified in their 2016 discussion paper.

These two reports update our two previous reports posted in September, 2017.

TAO-$GapUpdate2017-12

TAO-$GapUpdate2017-12-Backgrounder

Leave a Comment:

Leave a Comment: